SIP Information
|
February 06th 2012 |
|||||||||||
Testimonials -Stephen Schmidt- Do you have a testimonial you would like to add to our list? |
![]() Once the wall system is completed, it is very crucial to go back through and drill top plates at each vertical chase. Mark each vertical chase on the top plate and drill with a 1" to 1-1/2" spade bit. The wire chases will be marked on the panels interior side, and will be directly in the center of the panels. NOTE: This is the most common mistake, not drilling these out. It is necessary for the electrician, so he can access the wire chases. ![]() |
Contact Us at: IB Panels ® PO Box 723 50 West 100 South Jerome, ID 83338 PH: 208-324-7184 FAX: 208-324-6740 Toll Free: 888-799-1398 NTA Listing Report # IBP031109-7 NTA Formaledhyde Report # IBP042210-17 IM 14 TIP 01 Design Guide News from IB Panels ® Habitat for Humanity - "Blitz Build" was completed in 108 hours. IB Panels ® were used for the floors and walls. The walls were stood up within 45 minutes. Article 1 - Article 2 - Article 3. ![]() View This Home Oregon Registration # M397 ![]() |
||||||||||
| © Copyright 1995 - 2012 IB Panels ®, L.L.C., All Rights Reserved! | ||||||||||||