SIP Information
|
July 29th 2010 |
|||||||||||
Testimonials -Aronn Crozier- Do you have a testimonial you would like to add to our list? |
![]() Cutting Panels: Take the groove jet and make sure that wire is set to appropriate depth. After the wire has heated up, pull the groove jet through the foam. Make sure and go slow enough that the groove jet is riding on the two sheets of OSB. Also, if the groove jet is pulled too quickly through the panel, the wire will bend and the foam will not have a true flat cut. ![]() |
Contact Us at: IB Panels ® PO Box 723 50 West 100 South Jerome, ID 83338 PH: 208-324-7184 FAX: 208-324-6740 Toll Free: 888-799-1398 News from IB Panels ® Habitat for Humanity - "Blitz Build" was completed in 108 hours. IB Panels ® were used for the floors and walls. The walls were stood up within 45 minutes. Article 1 - Article 2 - Article 3. ![]() View This Home ICC # PFC 5361 Oregon Registration # M397 Quality Control Agency - PFS Corporation Madison, Wisconsin #98-33 ![]() ![]() |
||||||||||
| © Copyright 1995 - 2010 IB Panels ®, L.L.C., All Rights Reserved! | ||||||||||||