Fasteners:
 |
|
One option of fasteners would be to use 1 1/4 to 2 inch grabber screws. |
| |
 |
|
Another option would be to use 8 penny ring shank nails. |
| |
 |
|
All fasteners need to go through the OSB and into the metal. |
| |
 |
|
Fasteners need to be placed every 6 inches on vertical seams on both sides of the seams (staggered) and on both sides of the panel. |
| |
 |
|
Fasteners need to be placed every 12 inches on the base plates on both sides. |
| |
 |
|
Fasteners need to placed every 6 inches on the primary top plate and on the secondary top plate. You will need to stagger the fasteners so that there is 3 inches between the fastener for the primary plate and the fastener for the secondary plate. |
| |
|
 |
 |
 |
Contact Us at:
IB Panels ®
PO Box 723
50 West 100 South
Jerome, ID 83338
PH: 208-324-7184
FAX: 208-324-6740
Toll Free: 888-799-1398
NTA Listing Report # IBP031109-7
NTA Formaledhyde Report # IBP042210-17
IM 14 TIP 01 Design Guide
News from IB Panels ®
Habitat for Humanity - "Blitz Build" was completed in 108 hours. IB Panels ® were used for the floors and walls. The walls were stood up within 45 minutes. Article 1 - Article 2 - Article 3.
 View This Cabin
Up to 50% more energy efficient.
Approximately 40% less on-site labor.
Highly efficient, insulated corners, patented design.
Oregon Registration # M397

|
 |
 |