Structural Insulated Panels SIPs IB Panels Jerome Idaho The Only Way to Build
IB Panels ® - Structural Insulated Panels - The Only Way to Build!
Intermountain Building Panels
September 07th 2008




Testimonials
These panels are definitely volunteer friendly.
-Habitat for Humanity-


Do you have a testimonial you would like to add to our list?


Panels HOWTO - Quick Menu
General Information Floor Panels Wall Panels Roof Panels
Tools Required Materials List Fasteners Sealant/Caulk
Electrical Wiring Plumbing & Vents Panel Identification Panel Connection
-Back to Previous Page-

Electrical Wiring:

1-1/2 inch wire chases marked on the interior side of the panels
Enlarge Photo
    All wall and roof panels have 1-1/2" wire chases running inside the panels. Each chase is marked on the interior side of the panels.
 
drill top plates
Enlarge Photo
    During panel installation, it is very crucial that the top plates are drilled before the roof system or second level floor system is in place.
 
no photo yet for this entry     If the walls are to be wired from below the walls, it is necessary to drill out the base plate with a spade bit while setting panels. Measure the wire chase in the panel and drill the plate as each panel is set.
 
gutter for wiring
Enlarge Photo
    If roof panels are used, use top gap between wall panels and roof panels as a gutter for wiring. Then fill in gap after wiring is complete.
 
no photo yet for this entry     The easiest way to cut out boxes in the panels is to set up a jig and use a plunge router.
 
access horizontal and vertical chase
Enlarge Photo
    If it is necessary to access a horizontal chase from a vertical chase, run wire down vertical chase and then drill out a small plug at the junction of the vertical and horizontal. Then reach inside panel and turn the wire and push down the chase.
 
no photo yet for this entry     Cut all boxes in panels before wiring, then run wiring to the boxes.
 
no photo yet for this entry     It is recommended that any chases accessed from the outside be filled with insulation after the wires have been run.
 
no photo yet for this entry     Cut as little OSB as possible when wiring. If necessary, OSB can be routed horizontally, but this takes away from the structure of the panel, so do not make long runs in this fashion.
 
horizontal chases
Enlarge Photo
    Wall panels have set heights of 16" and 46" for horizontal chases in every panel. Specialized chases can be installed in the panel upon customer request.
 
flex bit
Enlarge Photo
    Use a flex bit to drill out wire chases that do not exist in the location where you need it at.
 



Contact Us at:
IB Panels ®
PO Box 723
50 West 100 South
Jerome, ID 83338
PH: 208-324-7184
FAX: 208-324-6740
Toll Free: 888-799-1398

News from IB Panels ®
Habitat for Humanity - "Blitz Build" was completed in 108 hours. IB Panels ® were used for the floors and walls. The walls were stood up within 45 minutes. Article 1 - Article 2 - Article 3.

View This Cabin

  • Up to 50% more energy efficient.
  • Approximately 40% less on-site labor.
  • Highly efficient, insulated corners, patented design.

    ICC # PFC 5361

    Oregon Registration # M397

    Quality Control Agency - PFS Corporation
    Madison, Wisconsin #98-33


    member of the structural insulated panel association

  • spacer.gif spacer.gif
    spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif
    spacer.gif © Copyright 1995 - 2008 IB Panels ®, L.L.C., All Rights Reserved!   spacer.gif
    spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif